Tin & Tantalite · Zimba District / Mulamfu Sector, Southern Province, Zambia
Zambia's first producing 3T mine
An operating hard-rock tin mine with an on-site 50 tph processing plant and high-grade concentrate — wholly African owned, majority Zambian owned.
65–70%
Tin concentrate grade
2,400 t
Concentrate per annum (target)
50 tph
Installed plant capacity
100%
African owned
Who we are
A producing tin asset in an under-supplied market
Mulamfu Resources Mining Ltd combines an operating hard-rock tin mine, an on-site processing plant and a high-grade concentrate specification — at a point in the cycle when tin concentrate is genuinely scarce.
65–70%
Tin concentrate grade
At or above typical smelter specification for cassiterite concentrate.
2,400 t
Concentrate per annum
Target steady-state output, roughly 200 t per month.
50 tph
Installed plant capacity
On-site processing already commissioned — no plant to build.
First
3T producer in Zambia
Tin, tantalum and tungsten — a new commodity stream for the country.
Ta₂O₅
Tantalite by-product
A second payable stream from the same ore body and circuit.
100%
African owned
Majority Zambian shareholding — genuine local ownership, not a fronting structure.
Market
Tin is in deficit, and the supply pipeline is thin
LME tin price, US$ per tonne
Sources: LME price points reported by Metal Radar and MacroMicro; deficit and demand commentary from Coface (Feb 2026) and Fitch Solutions/BMI. Prices are indicative, not a forecast.
First deficit since 2021
Refined output is forecast to grow around 3% in 2026, against roughly 3.5% demand growth.
Solder is half of demand
Tin sits directly in the semiconductor, data-centre and AI build-out supply chain.
Supply is concentrated
Myanmar, the DRC and Indonesia have all seen output interrupted; the project pipeline is thin.
Traceable supply is wanted
Buyers increasingly pay for concentrate with a clean, auditable chain of custody.
The asset
Zimba District / Mulamfu Sector, Southern Province, Zambia
- Hard-rock cassiterite mineralisation hosted in quartz veining, worked from both underground development and surface cuts.
- Road-served, within reach of the Zambia–Zimbabwe and Zambia–Namibia export corridors.
- Mining, haulage and processing all take place on site; ore does not leave the licence area until it is saleable concentrate.
- Tantalite occurs alongside the tin mineralisation, giving a second payable product from the same feed.
- Operations are already running with an owner-operated fleet and a permanent underground crew.
Geology & mineralisation
Cassiterite in quartz vein, worked on strike
- Mineralised quartz veining with strong iron-oxide staining at the contacts — the classic visual signature of a cassiterite-bearing structure.
- The vein is being followed underground on strike and at depth, with the face advanced by pneumatic drilling.
- Tantalite is recovered alongside the tin from the same mineralised material.
- Vein continuity observed in the current development supports extension of the mining front rather than a single isolated pod.
Grade and tonnage should be read against the company's own sampling and any independent resource work commissioned by an investor.
Operations
Two mining fronts, one owner-operated fleet
Underground development and surface cuts run in parallel, so plant feed is never dependent on a single source.
How the ore is won
Pneumatic jackleg drilling advances the development end along the vein. Broken ore is hand-sorted and barrowed to the decline, then hauled to surface — a labour-intensive method that keeps dilution low and gives close visual control of the vein.
Owner-operated fleet
Tracked excavators on site give the mine direct control over stripping, trenching and stockpile handling.
Feed already on the ground
Material is broken and staged on surface, shortening the lead time between a decision to ramp up and delivered concentrate.
Safety discipline
Full PPE in place across the crew — helmets, hi-vis overalls, gumboots and gloves.
Processing
50 tph plant, on site and operating
-
01
ROM ore
Stockpiled feed from underground and surface cuts.
-
02
Crushing
Reduction to liberation size for the gravity circuit.
-
03
Screening
Sizing and scrubbing to remove clays and fines.
-
04
Gravity separation
Density separation to recover cassiterite.
-
05
Cleaning & upgrade
Final upgrade to saleable concentrate specification.
50 tph
Nameplate throughput. Commissioned and on site — no greenfield build required.
10,400 t
Ore processed per month. Approximately 124,800 tonnes per annum at target run rates.
2%
Mass yield to concentrate. Ore-to-concentrate ratio delivered by the circuit.
Circuit configuration shown is indicative.
From the plant
Processed samples
Samples of processed material from the Mulamfu circuit. The dark, dense grains are the heavy mineral fraction recovered by gravity separation.
Production
Target production profile
| Plant capacity | 50 tph |
|---|---|
| Ore processed, per month | 10,400 t |
| Ore processed, per annum | ~124,800 t |
| Mass yield to concentrate | 2% |
| Concentrate, per annum | 2,400 t |
| Concentrate grade | 65–70% Sn |
| Contained tin, per annum | ~1,600 t |
| By-product | Tantalite (Ta₂O₅) |
Gross contained-tin value by tin price, US$ million
Illustrative only. Gross value of contained tin at 1,620 t per annum, before treatment and refining charges, penalties, transport, insurance and offtake payability terms — all of which reduce realised revenue. Not a revenue forecast.
Second revenue stream
Tantalite alongside the tin
- Tantalite occurs with the cassiterite in the same mineralised structure, so it is mined and treated without a separate operation.
- Tantalum is a designated critical raw material in both the European Union and the United States, with demand concentrated in capacitors, aerospace alloys and electronics.
- A second payable product improves the economics of every tonne of ore through the plant and softens exposure to a single metal price.
2 of 3
3T metals produced
1 orebody
Shared mining and feed
Critical
EU and US critical mineral
Ownership & people
African owned, Zambian led
- Wholly African owned, with a majority Zambian shareholding — ownership sits with the country the ore comes from.
- Zambian crews are employed and trained on site in drilling, ore handling and plant operation.
- Local procurement and local employment keep a larger share of the value chain inside Southern Province.
- A formal, licensed operation gives buyers an auditable chain of custody — increasingly a condition of sale for 3T minerals.
100%
African owned
Majority
Zambian shareholding
Jurisdiction
Why Zambia, and why this matters
1
A mining country
A century of large-scale mining, an established regulator, and a workforce and service sector that already understand the industry.
2
A new commodity stream
Zambia is known for copper and cobalt. Tin and tantalum diversify the country's mineral base — and Mulamfu would be first to produce them at scale.
3
Stable, rules-based tenure
Mineral rights are granted and administered under the national mining code, giving investors a documented title to underwrite.
4
Export routes in place
Southern Province sits on established road corridors to Walvis Bay, Beira and Durban, all used by existing Zambian mineral exporters.
Roadmap
From current operations to steady state
-
NOW
Mining and processing running
Underground development and surface cuts feeding the 50 tph plant; concentrate being produced.
-
NEXT
Ramp to nameplate
Lift throughput to a sustained 10,400 t of ore per month and hold concentrate grade at specification.
-
THEN
Secure offtake
Lock in a term offtake or trader relationship for tin concentrate, with tantalite priced separately.
-
BEYOND
Resource definition & expansion
Drill out and formalise the resource, extend the mining front, and evaluate a second processing line.
Every stage is funded from a producing base — the mine and the plant already exist, so capital goes into throughput and resource definition rather than into a greenfield build.
What we are looking for
Partners for Zambia's first 3T mine
Offtake
A term buyer for tin concentrate at 65–70% Sn, with tantalite priced separately.
Growth capital
Funding to ramp to nameplate, extend the mining front and add plant capacity.
Technical partnership
Metallurgical and resource-definition expertise to formalise the geology and lift recovery.
Get in touch
Mulamfu Resources Mining Ltd · Zimba District / Mulamfu Sector, Southern Province, Zambia