Mulamfu Resources Mining Ltd — home
Tracked excavator stacking mined ore at the Mulamfu site

Tin & Tantalite · Zimba District / Mulamfu Sector, Southern Province, Zambia

Zambia's first producing 3T mine

An operating hard-rock tin mine with an on-site 50 tph processing plant and high-grade concentrate — wholly African owned, majority Zambian owned.

Partner with us Investment overview

65–70%

Tin concentrate grade

2,400 t

Concentrate per annum (target)

50 tph

Installed plant capacity

100%

African owned

Who we are

A producing tin asset in an under-supplied market

Mulamfu Resources Mining Ltd combines an operating hard-rock tin mine, an on-site processing plant and a high-grade concentrate specification — at a point in the cycle when tin concentrate is genuinely scarce.

65–70%

Tin concentrate grade

At or above typical smelter specification for cassiterite concentrate.

2,400 t

Concentrate per annum

Target steady-state output, roughly 200 t per month.

50 tph

Installed plant capacity

On-site processing already commissioned — no plant to build.

First

3T producer in Zambia

Tin, tantalum and tungsten — a new commodity stream for the country.

Ta₂O₅

Tantalite by-product

A second payable stream from the same ore body and circuit.

100%

African owned

Majority Zambian shareholding — genuine local ownership, not a fronting structure.

Market

Tin is in deficit, and the supply pipeline is thin

LME tin price, US$ per tonne

36,787
56,800
52,219
49,606
55,594
Nov 2025 Jan 2026 May 2026 Jul 2026 Aug 2026

Sources: LME price points reported by Metal Radar and MacroMicro; deficit and demand commentary from Coface (Feb 2026) and Fitch Solutions/BMI. Prices are indicative, not a forecast.

First deficit since 2021

Refined output is forecast to grow around 3% in 2026, against roughly 3.5% demand growth.

Solder is half of demand

Tin sits directly in the semiconductor, data-centre and AI build-out supply chain.

Supply is concentrated

Myanmar, the DRC and Indonesia have all seen output interrupted; the project pipeline is thin.

Traceable supply is wanted

Buyers increasingly pay for concentrate with a clean, auditable chain of custody.

The asset

Zimba District / Mulamfu Sector, Southern Province, Zambia

  • Hard-rock cassiterite mineralisation hosted in quartz veining, worked from both underground development and surface cuts.
  • Road-served, within reach of the Zambia–Zimbabwe and Zambia–Namibia export corridors.
  • Mining, haulage and processing all take place on site; ore does not leave the licence area until it is saleable concentrate.
  • Tantalite occurs alongside the tin mineralisation, giving a second payable product from the same feed.
  • Operations are already running with an owner-operated fleet and a permanent underground crew.
Mined material staged in stockpiles on site
Mined material staged on site ahead of processing.
Iron-stained quartz vein exposed underground with crew working the face
Iron-oxide staining at the vein contact.

Geology & mineralisation

Cassiterite in quartz vein, worked on strike

  • Mineralised quartz veining with strong iron-oxide staining at the contacts — the classic visual signature of a cassiterite-bearing structure.
  • The vein is being followed underground on strike and at depth, with the face advanced by pneumatic drilling.
  • Tantalite is recovered alongside the tin from the same mineralised material.
  • Vein continuity observed in the current development supports extension of the mining front rather than a single isolated pod.

Grade and tonnage should be read against the company's own sampling and any independent resource work commissioned by an investor.

Operations

Two mining fronts, one owner-operated fleet

Underground development and surface cuts run in parallel, so plant feed is never dependent on a single source.

Miners drilling at the underground development face
Face drilling on the development end.
Ore hauled by wheelbarrow along the underground decline
Ore haulage from the working face.
Excavator opening a surface cut in red laterite soil
Excavator opening a surface cut along the mineralised trend.
Large stockpile of broken ore on surface
Ore stockpiled and blended ahead of the plant.

How the ore is won

Pneumatic jackleg drilling advances the development end along the vein. Broken ore is hand-sorted and barrowed to the decline, then hauled to surface — a labour-intensive method that keeps dilution low and gives close visual control of the vein.

Owner-operated fleet

Tracked excavators on site give the mine direct control over stripping, trenching and stockpile handling.

Feed already on the ground

Material is broken and staged on surface, shortening the lead time between a decision to ramp up and delivered concentrate.

Safety discipline

Full PPE in place across the crew — helmets, hi-vis overalls, gumboots and gloves.

Processing

50 tph plant, on site and operating

  1. 01

    ROM ore

    Stockpiled feed from underground and surface cuts.

  2. 02

    Crushing

    Reduction to liberation size for the gravity circuit.

  3. 03

    Screening

    Sizing and scrubbing to remove clays and fines.

  4. 04

    Gravity separation

    Density separation to recover cassiterite.

  5. 05

    Cleaning & upgrade

    Final upgrade to saleable concentrate specification.

50 tph

Nameplate throughput. Commissioned and on site — no greenfield build required.

10,400 t

Ore processed per month. Approximately 124,800 tonnes per annum at target run rates.

2%

Mass yield to concentrate. Ore-to-concentrate ratio delivered by the circuit.

Circuit configuration shown is indicative.

From the plant

Processed samples

Samples of processed material from the Mulamfu circuit. The dark, dense grains are the heavy mineral fraction recovered by gravity separation.

Bowl of processed sample with dark heavy-mineral grains
Processed sample 1.
Pan holding a processed sample of dark mineral grains mixed with quartz and iron-stained fragments
Processed sample 2.

Production

Target production profile

Steady-state parameters
Plant capacity50 tph
Ore processed, per month10,400 t
Ore processed, per annum~124,800 t
Mass yield to concentrate2%
Concentrate, per annum2,400 t
Concentrate grade65–70% Sn
Contained tin, per annum~1,600 t
By-productTantalite (Ta₂O₅)

Gross contained-tin value by tin price, US$ million

$64.8m
$72.9m
$81.0m
$89.1m
$40,000/t $45,000/t $50,000/t $55,000/t

Illustrative only. Gross value of contained tin at 1,620 t per annum, before treatment and refining charges, penalties, transport, insurance and offtake payability terms — all of which reduce realised revenue. Not a revenue forecast.

Second revenue stream

Tantalite alongside the tin

  • Tantalite occurs with the cassiterite in the same mineralised structure, so it is mined and treated without a separate operation.
  • Tantalum is a designated critical raw material in both the European Union and the United States, with demand concentrated in capacitors, aerospace alloys and electronics.
  • A second payable product improves the economics of every tonne of ore through the plant and softens exposure to a single metal price.

2 of 3

3T metals produced

1 orebody

Shared mining and feed

Critical

EU and US critical mineral

Worked ground and excavator on the mineralised structure
Worked ground on the mineralised structure.
Zambian underground crew in full PPE with an ore barrow

Ownership & people

African owned, Zambian led

  • Wholly African owned, with a majority Zambian shareholding — ownership sits with the country the ore comes from.
  • Zambian crews are employed and trained on site in drilling, ore handling and plant operation.
  • Local procurement and local employment keep a larger share of the value chain inside Southern Province.
  • A formal, licensed operation gives buyers an auditable chain of custody — increasingly a condition of sale for 3T minerals.

100%

African owned

Majority

Zambian shareholding

Jurisdiction

Why Zambia, and why this matters

1

A mining country

A century of large-scale mining, an established regulator, and a workforce and service sector that already understand the industry.

2

A new commodity stream

Zambia is known for copper and cobalt. Tin and tantalum diversify the country's mineral base — and Mulamfu would be first to produce them at scale.

3

Stable, rules-based tenure

Mineral rights are granted and administered under the national mining code, giving investors a documented title to underwrite.

4

Export routes in place

Southern Province sits on established road corridors to Walvis Bay, Beira and Durban, all used by existing Zambian mineral exporters.

Roadmap

From current operations to steady state

  1. NOW

    Mining and processing running

    Underground development and surface cuts feeding the 50 tph plant; concentrate being produced.

  2. NEXT

    Ramp to nameplate

    Lift throughput to a sustained 10,400 t of ore per month and hold concentrate grade at specification.

  3. THEN

    Secure offtake

    Lock in a term offtake or trader relationship for tin concentrate, with tantalite priced separately.

  4. BEYOND

    Resource definition & expansion

    Drill out and formalise the resource, extend the mining front, and evaluate a second processing line.

Every stage is funded from a producing base — the mine and the plant already exist, so capital goes into throughput and resource definition rather than into a greenfield build.

What we are looking for

Partners for Zambia's first 3T mine

Offtake

A term buyer for tin concentrate at 65–70% Sn, with tantalite priced separately.

Growth capital

Funding to ramp to nameplate, extend the mining front and add plant capacity.

Technical partnership

Metallurgical and resource-definition expertise to formalise the geology and lift recovery.

Get in touch

Mulamfu Resources Mining Ltd · Zimba District / Mulamfu Sector, Southern Province, Zambia

Contact

Mutinta Lunda

Phone: +260 966 333888

Email: lundam@mulamfuresources.com

Contact

Emmanuel Mwizerwa

Phone: +250 788 359 486

Email: mwizerwae@mulamfuresources.com